Pay in 4 interest-free payments of $3.74 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Pay in 4 interest-free payments of $3.74 Learn more
Ships within 48 hours · Estimated delivery Aug 20 - Aug 25
Publisher: Houghton Mifflin
Richard Williams
Contributor(s): Geo
ID: 16867
BTC Report 03 1897 Plate 21: Subway Stages of Work at Tremont Street, Boston, Massachusetts Step 1: Map Option:Small (8.5" x 11" Paper) Publisher: Houghton MifflinSubject: Tremont Street Subway (Now MBTA Green Line) Publisher: Boston Transit Commission Type(s): Architectural Drawing, Print Size: 22" wide x 9" high ID: BIT16600 Collection: WardMaps LLC Atlas: Boston Transit Commission Annual Report 03 1897 Boston in Transit Book Figure 3. 23 Construction Sequence at Tremont Street, 1897 Four cross section drawings articulate the sequence of construction at Section 6 of the Tremont Street Subway under Tremont